Jagroo v George Wimpey & Company Ltd
| Jurisdiction | Guyana |
| Court | High Court (Guyana) |
| Judge | George, J. |
| Judgment Date | 01 January 1972 |
| Neutral Citation | GY 1972 HC 10 |
| Docket Number | 3628 of 1970 |
| Date | 01 January 1972 |
George, J.
3628 of 1970
High Court
Labour Law - Master and servant — Wages
Mr. A. Chase for the plaintiff.
Mr. C.L. Luckhoo for the defendant.
Initially the plaintiff's claim against the defendant was for the sum of $679.93. This sum was made up as follows: $199.65 and $297.60 by way of additional wages for the periods January to September 1969 and October 1969 to September 1970, respectively, and $183.28 by way of overtime payments and wages in lieu of notice of dismissal. On the 30th November, 1970, when the matter came up in Bail Court, the defendants admitted liability in respect of the first period, and consented to judgment in the sum of $221.64 which was, in fact, the correct amount due for that period. They were granted leave to defend as the remainder of the claim. When the matter came up before me, counsel for the plaintiff intimated that he did not intend to pursue the plaintiff's claim for overtime or two weeks' pay in lieu of notice of dismissal. Accordingly, the only issue before is his claim for $297.60. This amount represents the balance which the plaintiff claims is due to him for work done by him on forty (40) Sundays during the period October 1969 to September, 1970. His rate of pay during this period was 93¢ per hour, but he claims that he should have been paid double this amount for the Sundays on which he worked. His claim to be so entitled would depend on whether his employment was in a factory as contemplated by the Factories Ordinance, Cap. 115, for, it is conceded that if he was so employed he would, having regard to the decision in Lindsay Parkinson & Co. Ltd. v. Scholsberg (1961) 3 W.I.R. 413 be entitled to judgment in his favour.
Before considering the issues of law it will be apposite at this stage to set out the evidence lead, most of which has not been contested. The defendants, who are building electrical and mechanical contractors were engaged during the period in question in the demolition of the old sea defence works between Kitty and Liliandaal, East Coast Demerara, a distance of one and one half miles, and the construction of a new one in its place. They employed over two hundred workmen, the work force consisting of carpenters, mechanical operators, mechanics, labourers and watchmen. The plaintiff was employed throughout the period in capacity and his duties included watching the works and the equipment and machines which were being used in its construction. On five of the Sundays under consideration he watched over a compound at Liliandaal which the defendants occupied.
The equipment used in carrying out the works included draglines, loaders, dumpers, bulldozers concrete mixers, water pumps, a crane fitted with a hoist derricking jib and other mobile appliances, compressors, vibrators and lighting plants. All these were mechanically or electrically propelled, and, in order to ensure their maximum use, six mechanics were employed whole time to effect any necessary repairs. Indeed, there is evidence that no day passed without some repairs being carried out to one or more of the machines and/or equipment.
The work appears to have been executed at a breath- taking pace, for the evidence is that the workday commenced each day at 6.00 a.m. and invariably ended after 9.30 p.m. In fact on several occasions it continued up to midnight.
The old sea defence works was made of concrete and steel. The concrete was demolished by means of hack hammers, and welding torches were then used to cut away the steel re-enforcement. The new work consisted of several sections which together I propose to call the wall complex. This wall complex, like its predecessor was run roughly east to west and its construction commenced at the eastern end situate at Kitty. Its width is about seventy-five (75) yards. The southern most portion of the complex consists of what could be described as a concrete pavement which was made of concrete slabs, and is six (6) feet wide. Immediately north of this pavement is the wall proper which is about six (6) feet wide and five (5) feet high and is made of concrete with reinforced steel. North of the wall are four concrete steps, and next to them is, what is called, a burm, which is twenty feet (20) wide. Adjoining the burm is a slope the width of which is between twenty to thirty feet. Both the burm and slope are made of concrete and boulders. Abutting the slope is a line of metal sheet piling, and, extending for a distance of about twenty-four feet immediately north of this piling are covered plastic baskets, into which have been packed small boulders. The foundation of the wall complex appears to be of sandcrete which is a mixture of cement sand and water.
The concrete and sandcrete for the wall complex were mixed in the concrete mixers and taken to the work site by means of the loaders. When the wall proper was being constructed, concrete, conveyed in the loaders, was poured into wooden frames which were made by the defendants' carpenters on the site. The sheet piling was cut to the required length scraped and then coated with an anti-corrosive material. Where this work was actually done is not stated, but after the pilings had been painted they were conveyed by draglines to the required spot and there driven into the earth by compressor monkeys.
In so fat as the baskets are concerned I prefer to and do believe the evidence, lead by the defendants wherever this differs from that lead by the plaintiff and his witnesses. I do not believe that only the sides of the baskets were brought to the worksite. I am satisfied that what was taken to the site were completed baskets with lids. When they arrived there they were in a flattened condition and had to be pulled upright by the workmen. They were then placed into the required positions, and mechanically loaded with boulders, which had previously been deposited on the sea dam. The boulders were then tightly packed into the baskets after which the lids were shut down and secured by means of a plastic coated wire of the same material used to make the side of the baskets.
The material used in the construction of the wall complex were first stored at the Kitty playground. Later they were stored about 20 yards east of Pere Street, Kitty, and finally at Conversation Tree, Liliandaal. They were transported to the actual site by melons of trucks and trailers in addition to the loaders. The machines and other equipment were left overnight at whatever point worked ceased for the day.
Based on the foregoing facts counsel for the plaintiff submits that during the demolition of the old sea defence works and the construction of the new one the plaintiff, was employed either in a factory or in building operations within the contemplation of the Factories Ordinance, the provisions of which have to a large extent been drawn from the English Factories Act, 1937. I now proceed to examine the first of these two contentions. Under sec. 2(1) of the Ordinance a ‘factory’ is defined as follows:-
“(a) any premises in which, or within the close or curtilage or precincts of which, persons are employed in manual labour in any process for or incidental to any of the following purposes that is to say:
(1) the making of any article or part of any article; or
(2) the altering, repairing ornamenting, finishing, cleaning or washing or the breaking up or demolition of any article; or
(3) the adopting for sale of any article; or
(4) the generating, transforming or converting, or switching controlling or otherwise regulating electrical energy,
and the work is carried on by way of trade or for purposes of gain and to and over which the employer of the person therein has a right of access or control.”
Counsel for the plaintiff argues that the wall complex are premises in which or within the close or curtilage or precincts of which persons are engaged in manual labour in a process or processes for or incidental to the making and/repairing articles and that the operations were carried on for purposes of or the purposes of gain. For the purposes of examining the several facets of the definition as contained in the provisions referred to above, I shall for the present assume that the wall complex are premises within the contemplation of the section. There can be little room for argument that most of the persons employed in the demolition of the old wall and the construction of the new complex were engaged in manual labour, and, indeed, no argument was advanced to the contrary. Counsel for the plaintiff contends, that the frames, which were made by the carpenters and into which cement was poured in order to make the wall proper, are articles as contemplated by the definition of a ‘factory’, and were made on the site. Further, he submits, the repairs done to the machines and other equipment, as well as the mixing of the cement, which he argues is in itself the making of an article, were effected within the close curtilage or precincts of the wall complex.
I shall first deal with the place or places where the concrete was mixed and the machines repaired. As regards the repairs to the machines there is no evidence in that this was done on the site itself, and it is hardly likely that this would in fact have been the case, having regard to the nature of the works which involved such a substantial use of cement. I shall therefore, assume that this was done near to the site itself. The cement appears to have been mixed some distance from the site as vehicles had to be used to convey the mixture to the actual site. The issue, therefore, is whether the place or places where the repairs were effected and the cement mixed were within the close cartilage or precincts of the wall complex. The meaning of the word ‘precinct’ was considered in the case of Chatburn v. Manchester Dry Dock Co. Ltd, ...
Get this document and AI-powered insights with a free trial of vLex and Vincent AI
Get Started for FreeUnlock full access with a free 7-day trial
Transform your legal research with vLex
-
Complete access to the largest collection of common law case law on one platform
-
Generate AI case summaries that instantly highlight key legal issues
-
Advanced search capabilities with precise filtering and sorting options
-
Comprehensive legal content with documents across 100+ jurisdictions
-
Trusted by 2 million professionals including top global firms
-
Access AI-Powered Research with Vincent AI: Natural language queries with verified citations
Unlock full access with a free 7-day trial
Transform your legal research with vLex
-
Complete access to the largest collection of common law case law on one platform
-
Generate AI case summaries that instantly highlight key legal issues
-
Advanced search capabilities with precise filtering and sorting options
-
Comprehensive legal content with documents across 100+ jurisdictions
-
Trusted by 2 million professionals including top global firms
-
Access AI-Powered Research with Vincent AI: Natural language queries with verified citations
Unlock full access with a free 7-day trial
Transform your legal research with vLex
-
Complete access to the largest collection of common law case law on one platform
-
Generate AI case summaries that instantly highlight key legal issues
-
Advanced search capabilities with precise filtering and sorting options
-
Comprehensive legal content with documents across 100+ jurisdictions
-
Trusted by 2 million professionals including top global firms
-
Access AI-Powered Research with Vincent AI: Natural language queries with verified citations
Unlock full access with a free 7-day trial
Transform your legal research with vLex
-
Complete access to the largest collection of common law case law on one platform
-
Generate AI case summaries that instantly highlight key legal issues
-
Advanced search capabilities with precise filtering and sorting options
-
Comprehensive legal content with documents across 100+ jurisdictions
-
Trusted by 2 million professionals including top global firms
-
Access AI-Powered Research with Vincent AI: Natural language queries with verified citations
Unlock full access with a free 7-day trial
Transform your legal research with vLex
-
Complete access to the largest collection of common law case law on one platform
-
Generate AI case summaries that instantly highlight key legal issues
-
Advanced search capabilities with precise filtering and sorting options
-
Comprehensive legal content with documents across 100+ jurisdictions
-
Trusted by 2 million professionals including top global firms
-
Access AI-Powered Research with Vincent AI: Natural language queries with verified citations